welcome guest [ login | register ]
Currently you can only view offered courses. Please login for more options.

$160.0051 - Emergency Operations Procedures

Course Name: TEG_103_EOP_OPC_OL_CLASS_51

Each Transmission Operator and Balancing Authority needs to develop, maintain, and implement a set of plans to mitigate operating emergencies. These plans need to be coordinated with other Transmission Operators and Balancing Authorities, and the Reliability Coordinator.

Credit: 8CEH (8OP,8STDS,8PROF,8EO)

$20.0051.1 - Emergency Operations Planning

TEG_103_EOP_OPC-OL-Class_51_SECTION_1

NERC Standard EOP-001
Each Transmission Operator and Balancing Authority needs to develop, maintain, and implement a set of plans to mitigate operating emergencies. These plans need to be coordinated with other Transmission Operators and Balancing Authorities, and the Reliability Coordinator.

(Credit: 1CEH, 1EO, 1OP, 1STDS, 1PROF)

View Syllabus

$20.0051.2 - Capacity and Energy Emergencies

TEG-103-EOP-OPC-OL-Class_51_SECTION_2

NERC Standard EOP-002
Required actions for capacity and energy emergencies. Instruction pertaining to communication, operational data, logs and voice recordings relevant to implementation of an automatic load shedding system and procedures in the event of limited capacity.

(Credit: 1CEH, 1EO, 1OP, 1STDS, 1 PROF)

View Syllabus

$15.0051.3 - Load Shedding Plans

TEG_103_EOP_OPC_OL_CLASS_51_SECTION_3

NERC Standard EOP-003
Instruction on the planning, identification and implementation of an automatic load shedding system and procedures in the event of limited capacity.

(Credit: .75CEH, .75EO, .75OPS, .75STDS, .75PROF)

View Syllabus

$15.0051.4 - Disturbance Reporting

TEG_103_EOP_OPC_OL_CLASS_51_SECTION_4

NERC Standard EOP-004
Instruction on the appropriate procedures and protocols for identification, documentation, reporting and record retention related to disturbance events.

(Credit: .75CEH, .75EO, .75OP, .75STDS, .75PROF)

View Syllabus

$20.0051.5 - System Restoration Plans

TEG_103_EOP_OPC_OL_CLASS_51_SECTION_5

NERC Standard EOP-005 Instruction on plans, procedures and resources to restore systems to normal operation following a partial or total shutdown.

(Credit: 1CEH, 1EO, 1OP, 1STDS, 1PROF)

View Syllabus

$20.0051.6 - Reliability Coordination

TEG_103_EOP_OPC_OL_CLASS_51_SECTION_6

NERC Standard EOP-006
Instruction on Reliability Coordinator\'s role in coordinating system restoration. Transmission Operators and Balancing Authorities are instructed on their supporting activities in this coordination and the importance of effective communication.

(Credit: 1CED, 1EO, 1OP, 1STDS, 1PROF)

View Syllabus

$15.0051.7 - Establish, Maintain and Document Regional Blackstart Capacity Plan

TEG_103_EOP_OPC_OL_CLASS_51_SECTION_7

NERC Standard EOP-007
Instruction on the methods and procedures to achieve a Blackstart Capability Plan (BCP) in coordination with Regional System Restoration Plans (SRP).

(Credit: .75CEH, .75EO, .75OPS, .75STDS, .75PROF)

View Syllabus

$20.0051.8 - Plans for Loss of Control Center

TEG_103_EOP_OPC_OL_CLASS_51_SECTION_8

NERC Standard EOP-008
Instruction in strategic contingency and continuity plans in the event the control center becomes inoperable.)

(Credit: 1CEH, 1EO, 1OP, 1STDS, 1PROF)

View Syllabus

$15.0051.9 - Documentation of Blackstart Generating Unit Test Results

TEG_103_EOP_OPC_OL_CLASS_51_SECTION_9

NERC Standard EOP-009
Instruction on the responsibilities of the generator owner and operator for appropriate testing of Blackstart Capability, and the documentation of these tests including record distribution and retention.

(Credit: .75CEH, .75EO, .75OP, .75STDS, .75PROF)

View Syllabus