| You are not logged in. [sign in] [register] |
|
|
Please login to purchase classes
Section Listing
Advanced Voltage Collapse and Contingencies
$120.00
This class is an advanced version of Class 55 related to Voltage, SOL/IROL, AGC and Communications.
Credit: 8CEH (8STDS,8PROF,4EO) Voltage and Reactive Control
$15.00
NERC Standard VAR-001-1a
NERC Standard EOP-003-1 Voltage levels, reactive flows, monitoring, controls, emergencies and maintenance of limits in addition to emergency measures involving Load Shedding to prevent uncontrolled failure of components of cascading outages of the Interconnection. (Credit: 1CEH, .5EO, 1STDS, 1OP, 1PROF) Transmission Operations
$15.00
NERC Standard TOP-004-2
NERC Standard EOP-001-1 Instability, uncontrolled separation, emergencies, cascading outages and contingencies. It will also cover emergency planning requirements to be coordinated by Transmission Operators, Balancing Authorities and Reliability Coordinators. (Credit: 1CEH, .5EO, 1STDS, 1OP, 1PROF) Operations Reliability Information
$15.00
NERC Standard TOP-005-1
NERC Standard EOP-006-1 Types of information required to be communicated, methods of communication and record retention in emergency and non-emergency circumstances. It will also cover the responsibilities related to disturbance reporting. (Credit: 1CEH, .5EO, 1STDS, 1OP, 1PROF) Monitoring System Conditions
$15.00
NERC Standard TOP-006-2
NERC Standard EOP-007-0 Responsibilities for monitoring and information flow, emergencies, those to/from information is required, forecasting and deviation monitoring. It will also cover capacity and energy emergency situations, requirements and measures. (Credit: 1CEH, .5EO, 1STDS, 1OP, 1PROF) Reporting SOL and IROL Violations
$15.00
NERC Standard TOP-007-0
NERC Standard EOP-005-1 Requirements, emergencies, measures and compliance related to Standard Operating Limits (SOL) and Interconnection Reliability Operating Limits(IROL) in addition to covering System Restoration Plans. (Credit: 1CEH, .5EO, 1STDS, 1OP, 1PROF) Response to Transmission Limit Violation
$15.00
NERC Standard TOP-008-1
NERC Standard EOP-004-1 Required emergency and non-emergency responses to SOL and IROL violations. Reliability Coordination for System Restoration and Plans for Loss of Control Center Functionality. (Credit: 1CEH, .5EO, 1STDS, 1OP, 1PROF) Automatic Generation Control
$15.00
NERC Standard BAL-005-0.1b
NERC Standard EOP-008-0 Responsibility and timeframe for reporting any inability to meet ACE time limits or minimum availability requirements, BA AGC and ACE calculation relating to Regulating Reserves, emergency and non-emergency compliance requirements. Documentation of Blackstart Generating Unit Test Results. (Credit: 1CEH, .5EO, 1STDS, 1OP, 1PROF) Communication and Coordination
$15.00
NERC Standard COM-002-2
NERC Standard EOP-002-2.1 Transmission Operators responsibility for communication with RC and the method of communication and assurance of accuracy of information communicated under normal and emergency circumstances. It also covers the responsibilities and requirements for Reliability Coordinators as relates to System restoration following an outage. (Credit: 1CEH, .5EO, 1STDS, 1OP, 1PROF)
Copyright © 2008. The Energy Group of America - Terms of Use
This page was loaded in [0.00570] seconds. |